Another solo paddle down and up the the Hackensack River from Laurel Hill Park to Route 1-9 Truck Route past the Pulaski Skyway and back. The weather was slightly overcast with a slight breeze but the temperature was in the low 70’s so I was very comfortable the entire paddle. In total the trip was 8.5 miles round-trip and it took just over 3 hours. I did this trip solo working hard all the way down and up the river.
To view the uploaded pictures in my Picasa Web album, click the ink below:
This was a very wide portion of the river at points and though I was paddling downstream initially, I think the tide was coming in and therefore I was paddling against the current as well as the wind. While I was tired on the way home it was definitely easier. There was a chop to the water and wakes from the 3 or 4 motors boats I past provided a nice roll to the river. There was more movement in the water than I was used to and gave me a good work out as I paddled for almost 3 straight hours.
This trip was mainly about seeing the sights of industrialized New Jersey with the Empire State Building and the rest of the New York Skyline looking in the background. While I was focusing on bridges and power plants I did encounter a few cormorants sunning on top of some pilings and got some good pictures of them. I also caught a hawk circling above the Laurel Hill Rock with the faded Steal Your Face painted into it. Finally, I took some pictures of a lovely ducky couple wading in the waters just past the Pulaski Skyway. That was the extent of the wildlife as the rest of the trip was all about the New Jersey look, smell and feel that makes Tony Soprano proud.
Time Line:
- 2:25 p.m. – Tweeted that I was about to Launch from Laurel Hill Park
- 2:35p.m. – First picture on the water
- 2:41 p.m. – Cross the river to photograph 5 cormorants on pilings
- 2:49 p.m. – Go under the eastern spur of the Turnpike
- 2:57 p.m. – Go under NJ Transit railroad bridge
- 3:32 p.m. – Turn the horn of the river by the huge coal fired power plant (2.5 miles)
- 3:43 p.m. – Go under second NJ Transit railroad bridge
- 3:53 p.m. – Go under Newark Turnpike (Road that connects 280 to Holland Tunnel and adjacent railroad bridge (3 miles)
- 3:57 p.m. – Go under NJ Path railroad bridge
- 4:11 p.m. – Go under Pulaski Skyway (3.5 miles)
- 4:14 p.m. Photograph 2 ducks just past the Pulaski Skyway
- 4:33 p.m. – Go under Route 1-9 Truck Route
- 4:35 p.m. – Turn around and furthest southern extent just past Route 1-9 Truck Route bridge (4.2 miles)
- 4:45 p.m. – Go back under Pulaski Skyway (5 mies)
- 4:57 p.m. – Go back under NJ Path railroad bridge
- 4:59 p.m. – Go back under Newark Turnpike (Road that connects 280 to Holland Tunnel and adjacent railroad bridge
- 5:04 p.m. – Go under second NJ Transit railroad bridge (6 miles)
- 5:10 p.m. – Turn back on the horn of the river by the huge coal fired power plant (6.5 miles)
- 5:30 p.m. – Go back under NJ Transit railroad bridge
- 5:35 p.m. – Go back under the eastern spur of the Turnpike (7.9 miles)
- 5:46 p.m. – Last Picture on water (8.5 miles)
- 6:06 p.m. – Pack and rolling out of the Laurel Hill Park.